Construction News at OSD

All,

Below is a listing of activities to take place during the week of 8/30/10 at OSD sites.

  • Grade/fabric/stone roadways.
  • Seed detention basin #1 and #2.
  • Pending material delivery, possibly start installing the retaining walls.
  • Misc. site grading
  • Existing water line demo.
  • Install new gas service to the existing gym and to the academic building.

Accurate Elecrics

  • Old UT/FO conduit demo. 

(Updated 09/1/2010)
 

Safety
With all of the changes taking place, total separation will be complete between the schools and the construction sites very soon. We ask that the schools remind their staff and students that the construction areas are off limits. Safety of all staff and students is priority one and is discussed with our workers during their orienations.

With the traffic pattern changes the CFD Station #19 and #24 along with Worthington Fire & EMS remind us that in the events of an emergency situation that exact instructions are given to the 911 operator on how emergency vehicles should enter the facility. This applied to both schools and the construction sites.
(Updated 5/10/10)


Effective Monday morning, May 10th, we will close the fences circling the construction area and put into effect the new traffic and parking patterns for OSD.  Attached is the Traffic & Parking at OSD site map showing the new traffic and parking plans for you to keep and study. (Updated map 5/6/10)

  1. Cars, trucks, vans, and buses can enter OSD from Morse Road entrance and take the first right road since this road is designated as a ONE WAY street leading into OSD.   The Indianola Road entrance/exit is designated as two way street.  

  2.  There is an Event Parking space on the map for teachers and other staff members to park their vehicles when they report for work in the morning.  
  3. Buses/vans/cars transporting students entering from Morse Road are to drive around the campus to the Administration building to drop the students off.  Buses/vans/cars transporting students entering from Indianola Road are to drive to the Administration building to drop off the students.  All vehicles must exit at Indianola Road.  
  4.  There will be NO PARKING signs posted along the road that is designated as a TWO LANE STREET as shown on the attached map. 

  5.  There are additional parking spaces (please study the map for additional parking spaces).
     
  6. For people using the OSD Conference Center, there are additional parking spaces going from the end of the Staff Building to the Water Towers (where the old girls’ dormitories used to be). 
  7.  Parents dropping off and/or picking up their children at the Alice Cogswell Center will park their cars between Dormitories B-4 and B-5. 

  8. There are handicapped parking spaces --- please refer to the Traffice & Parking at OSD map for these spaces.

  9.  Please observe all posted signs along the driveways.  


    For OSD's Neighbors:
    As Superintendent of the Ohio School for the Deaf (OSD), I feel it is important to communicate with you about the new school and residence buildings being built on our campus.  By now, you have seen the arrival of heavy construction equipment and have noticed the removal of trees that are in the "footprint" of the new school and residence buildings.  Simultaneously, Columbus Gas Company has been clearing brush and scrub trees from the right-of-way over the path of their gas line that parallels the OSD/OSSB property line and in the reserve area.

    The OSD Staff and students have been involved in a long process of designing the new school and residence buildings.  We at OSD are very excited about our new school and residence buildings for our current and future students! You can learn more about the Ohio School for the Deaf and the new facilities being built by visiting our web site:

    www.ohioschoolforthedeaf.org

    Another convenient way to keep you informed about our progress would be through e-mail updates.  If you would like to receive regular e-mail updates on our new construction, please send me an e-mail requesting that your name be added to that distribution list.  Please send an e-mail to Corbett@osd.oh.gov to be added to this list.

    If you have any questions or concerns regarding the building of our new facilities, feel free to send me an e-mail or to call me at 728-1556.

    Sincerely,

    Edward E. Corbett, Jr.
    Superintendent

    Click here to download PDF of this announcement.

 


Construction at OSD has started!
Click here to read more


DEAFNESS 101 for Construction Workers
Click here to view the Powerpoint


OSD's Site Logistics Plan/Notes/Instructions
are two sheets outlining the OSD Site Logistics Plan with notes for the forthcoming constructin of the new academic and residential buildings. Please study both sheets.

Sheet 1 depicts the campus map with construction area; construction fence posted around the construction area; construction gates with trailers and parking for the workers; emergency vehicle access; new school bus drop-off and pick-up area; new event parking and additional parking areas. There is a legend on each sheet illustrating what is what – e.g., orange line meaning a 6’ chain link construction fence around the construction area will be put up.

Sheet 2 depicts the roadway access to both points (the construction area with parking area for the construction workers and construction trailers; and, the Harlow Vocational Wing area).  Click here to read the rest of the list.

Please visit newcampus.osd.oh.gov to read more about it. You can download this list by clicking here.
You must have Acrobat Reader to read this.
(Updated 4/9/10)
 

 



 
 
Weather | Library | Calendar | Cafeteria | Links | My Mail | Job Posting | Contact Us | Site Map

@ 2008, Ohio School for the Deaf, All Right Reserved.